Home > News > Content

Product Categories

Zhangjiagang Wilford Thermal Co.,Ltd

ADD: No.5 Nanyuan Road Economic Development Zone Zhangjiagang, Jiangsu Province 215618 P.R. China

Phone: 86-13601568070


Address: No5,Nanyuan Road Economic Development Zone, Zhangjiagang

P.C: 215600

Tel: 86-512-58170166

Fax: 86-512-58698850

Email: manager@wilfordboiler.com

Free after-sales service telephone: 86-512-58170166


Agency in Shandong

Address: No.1515-1517,Dongsheng Office Building,Longdu Street,Zhucheng city,Shandong Province

Tel: 86-512-58917110

Phone: 86-13701567850


Riga Trading

Address: Beirut - Lebanon AI Dora - Mar Youssef Street Joumayel Building - 1st floor Lebanon

Mobile: 961-1-260029

Fax: 961-1-260028


How To Arrange The Steam Boiler Blowdown?
Mar 06, 2017

Long-term use of steam boiler fouling formation is inevitable, so every once in a while just needs a drainage, if a boiler at the same time need several pipes for sewage, so all tubes for all need drainage, if part to blowdown, regardless of the remaining, after a long time will lead to the steam boiler water quality became bad, still can cause drainage pipe jam, serious when even can also lead to water pipe burst.


There is a situation that is to say, multifunction steam boiler of a sewage pipe, and each steam boiler and do not have to check it, then you have to stop them at the same time the sewage, the purpose is to prevent the steam boiler sewage flows into the adjacent time in the sewage, the solution is in series two of the sewage valve in each of the sewage pipes


Disclaimer: this article content is for reference only

Quick Navigation
  • About Us
  • Products
  • News
  • Exhibition
  • Contact Us
  • Feedback
  • trade-global.com
  • Newsletter
    Enter in your email address to receive deals and coupons.
    86-512-58170166
    86-512-58698850 manager@wilfordboiler.com